|
SHORT DESCRIPTION |
AIR BRAKE EQUIPMENT AC, SDC, WCB |
LONG DESCRIPTION |
AIR BRAKE EQUIPMENT FOR AC, SDC WGSRJ, ML, WCB COACHES TO MATERIAL SCHEDULE NO.ICF/SK-10-2-610, ISSUE STATUS-01, REV-00. |
SPECIAL CONDITION |
1. INSTALLATION REQUIRED AS PER ASSY DRG ANNEXURE-A TO BE FOLLOWED.2. SUPPLYRATES INSTALLATION RATES TO BE QUOTED SEPARATELY.3.INSTALLATION TO BE DONEAS PER SCOPE OF INSTALLATION AND TESTING ICF/MFPL/170/001,ISSUE STATUS-01,REV-01AND SCHEDULE OF DRAWING AND PERMISSIBLE TIMINGS ICF/MFPL/503,ISSUESTATUS-01,REV-00. |