VendorDirectory
| Stores ▾ | Downloads | S&I Vendor Portal | Vendor Grievance Redressal Portal Contact Us  
 
PL - 31420606

SHORT DESCRIPTION FRP PANELING FOR SIDE WALL
LONG DESCRIPTION FRP PANELING WITH FIXING REQUIREMENTS FOR SIDE WALL, END WALL, PARTITION ANDROOF PANELING OF EMU/3PH COACHES TOSPECN. No. ICF/MD/SPEC-167A, ISSUE STATUS-01, REV-05 WITH AMD-01 02ANDGENERAL ARRANGEMENT AND DIMENSIONS TODRG. Nos.EMU/D/HC/3PH-4-2-001, COL-I, ALT- a, ITEMS- 1,2,3,4,8 9,ICF/MRVC/D3/HC/BT-4-3-302, COL-I,ALT-NIL, ITEM-6,ICF/MRVC/D3/HC/ BT-4-4-304, COL-I, ALT-g, (EXCEPT ITEM-2).
SPECIAL CONDITION SPECIAL CONDITION:1. INSTALLATION REQUIRED AS PER ASSY. DRG ANNEXURE- AHAS TO BE FOLLOWED.2. SUPPLY RATES INSTALLATION RATES TO BE QUOTEDSEPARATELY.3. THERE WILL BE MINOR DESIGN CHANGES IN THE DRGS WITH RESPECT TOPROPULSION SYSTEM OF EMU's. FIRM HAS TO CONFIRM THE EXACT DRGS TO BE FOLLOWEDFROM ICF, BEFORE TAKING UP MANUFACTURING.4. FRP PANEL COLOUR SHADE APPROVALSHOULD BE OBTAINED FROM ICF/DESIGN BEFORE MAKING SUPPLY.