VendorDirectory
| Stores ▾ | Downloads | S&I Vendor Portal | Vendor Grievance Redressal Portal Contact Us  
 
PL - 31420898

SHORT DESCRIPTION S&I OF FRP PANEL IN MEMU/DMC/3PH
LONG DESCRIPTION ONE COACH SET OF FRP PANELLING WITH FIXING REQUIREMENTS FORMEMU/DMC/3PH COACHES CONSISTS OF:1)SIDE WALL/END WALL PANEL TO DRG. No. MEMU/DMC/3PH-4-2-001,COL-I, ALT-NIL.2)PARTITION PANEL TO DRG.No. MEMU/DMC/ 3PH-4-3-001,COL-I, ALT- b,ITEM3 43)ROOF PANEL TO DRG.No. MEMU/DMC/3PH-4-4-001, COL-I,ALT- a, AND FRP PANEL SHOULDCONFORM TO SPECN. ICF/MD/SPEC-167A, ISSUE STATUS-01,REV-05 WITH AMD-0102.
SPECIAL CONDITION 1) INSTALLATION REQUIRED AS PER ASSY.DRG. ANNEXURE-A TO BE FOLLOWED2)SUPPLY RATES INSTALLATION RATES TO BE QUOTED SEAPRETLY