VendorDirectory
Mechanical ▾ | Electrical ▾ | Stores ▾ | Downloads | S&I Vendor Portal Contact Us  
 
PL - 33612020

SHORT DESCRIPTION UNF S&I OF FRP DRP MOD TOILET LHB AC 2 T
LONG DESCRIPTION PRE ASSEMBLED FRP DROP DOWN MODULAR TOILET FOR LHB AC 2-TIER & 3 -TIERTO DRG.NO. LWSCWAC/EOG-6-3-010, COL-1, ALT-b AND AS PER SPECN. ICF/MD/SPEC-343, ISSUESTATUS-01,REV-01 WITH AMD-1.
SPECIAL CONDITION SPECIAL CONDITION:1. SCOPE OF SUPPLY OF FRP LAVATORY MODULE AND AMENITYFITTINGS SHALL BE AS PER CLAUSE 3.I (iv) OF SPECN MDTS-214.2. INSTALLATIONOF FRP MODULAR TOILETS SHOULD BE CARRIED OUT BY THE SUPPLIER & ANNEXURE -A TO BEFOLLOWED.3. SUPPLY AND INSTALLATION OF LAV PAN AND EURO BOWL TODRG.NO.LE63202, ALT- d AND LS63117, ALT- a RESPECTIVELY WILL BE IN THE SCOPE OFSUPPLIER. SUPPLY RATES AND INSTLLATION RATES OF LAV.PAN & EURO BOWL TO BE QUOTEDSEPARATELY.4. ALL ITEMS OF LAVATORY MODULES TO DRG.NO.1 10113.0.30.000.013,ALT- DR7, 1 10113.0.30. 000.015, ALT - DR6 AND LE63110, ALT - h SHOULD BESUPPLIED AND INSTALLED BY THE SUPPLIER.5. ALL ITEMS OF PIPE CONNECTIONSINSIDE LAVATORY TO DRG.NO. LE63157, ALT- h, LE63160, ALT-i AND LE63161, ALT- dEACH = 1 NO. SHOULD BE SUPPLIED AND INSTALLED BY THE SUPPLIER (CLAUSE-4 OFMDTS-214 IS NOT APPLICABLE)6. PLUMBING ARRANGEMENT TO AUXILIARY WATER TANKFROM UNDER THE COACH TO DRG.NO.LE63227, ALT-c = 2 NOS. SHOULD BE SUPPLIED ANDINSTALLED BY THE SUPPLIER.7. SUPPLY AND INSTALLATION OF FLOOR DRAINARRANGEMENT TO DRG.NO.LW63138, ALT- d WILL BE IN THE SCOPE OF THESUPPLIER.8. PACKING CONDITION AS PER DOC.NO.PI111.9. THE MATERIALHANDLING EQUIPMENT FOR LOADING OF MODULES WILL BE SPARED BY ICF.