VendorDirectory
| Stores ▾ | Downloads | S&I Vendor Portal | Vendor Grievance Redressal Portal Contact Us  
 
PL - 31160165

SHORT DESCRIPTION ONE C/S SS ROOF AND SIDE WALL
LONG DESCRIPTION ONE COACH SET OF STAINLESS STEEL ROOF AND SIDE WALL FOR 3 PHASE ACEMU MOTOR COACHES (617) AND (621) TO DRG.NOS.EMU/M/3PH-1-6-001/COL.I ALT " e " - 1 NOEMU/M/3PH-1-4-001/COL.I ALT " a " - 1 NOEMU/M/3PH-1-4-001/COL.II ALT " a " - 1 NOTHE FIRM SHALL FULFIL THE REQUIREMENT TO SPECN ICF/MD/SPECN.200 ISSUESTATUS 01REV.04, AMENDMENT-01
SPECIAL CONDITION -LOOSE ITEM OF AIR DUCT SUPPLIED MUST BEASSEMBLED BY THE FIRMATICF.-ANNEXURE "A" DT. 22/08/2012 TOBE FOLLOWED.-PACKING CONDITION AS PERICF/J T/MISC-2402ALT'''' b ''''THERE WILL BE MINOR CHANGES IN DRAWINGS WITHRESPECT TO PROPULSION SYSTEM OF EMU'S FIRMS HAS TO CONFIRM EXACT DRAWINGS TO BEFOLLOWED FROM ICF BEFORE TAKING UP MANUFACTURING