SHORT DESCRIPTION | SNI PRE-INSU AIR INLETDUCT LACCN | ||||||
LONG DESCRIPTION | SUPPLY AND INSTALLATION OF PRE-INSULATED AIR INLET DUCT FOR AC 3-TIER(LHB EOG)COACHES TO DRG.NO.LE44117, ALT-b WITH SELF INSULATED BOARDS OF SPECIFICATIONMMDTS-18006 REV.NIL, WITH ANNEXURE-BJ DATED 27.8.2019. | ||||||
SPECIAL CONDITION | 1) INSTALLATION ANDCOMMISSIONINGREQUIRED AS PER ASSEMBLYDRG. AND ANNEXURE-A TOBE FOLLOWED.2) SUPPLY RATES AND INSTALLATION RATES TO BE QUOTED SEPARATELY. |